What Is Cubic ERP for Civil EPC?
Cubic ERP for Civil Builders and EPC Contractors is an industry-specific project ERP built for highway contractors, bridge builders, metro and railway EPCs, water pipeline contractors, and industrial building developers. It digitises the entire construction billing chain — from site measurements to certified RA bills — and gives project directors real-time Earned Value visibility on every project they run.
Digital Measurement Book (MB Book / JMR)
Paper measurement books are replaced by a digital JMR (Joint Measurement Register). Each entry captures description, chainage, item dimensions, calculated quantity, GPS coordinates, and photographic proof from the site. Measurements go through a three-tier digital certification chain — Site Engineer → QC Inspector → Project Manager — before any quantity is accepted for billing.
CPWD / FIDIC Subcontractor RA Billing
Running Account bills are generated directly from certified JMR data in one click. The system automatically deducts 5% Retention Money, recovers Mobilization Advance outstanding, applies TDS under Section 194C, and produces the CPWD Format-7 abstract ready for Resident Engineer sign-off. BOQ ceiling locks prevent any measurement exceeding the contracted quantity from being billed.
WBS Project Planning and Critical Path Tracking
Projects are broken into a Work Breakdown Structure of Phase → Milestone → Activity with assigned weightage. Critical Path activities are flagged. Planned versus actual completion percentages roll up automatically through the WBS hierarchy. Project managers see exactly where the project stands against the baseline schedule at all times.
Earned Value Management (EVM) and S-Curves
Planned Value (PV), Earned Value (EV), and Actual Cost (AC) are calculated from live site data every day. Cost Performance Index (CPI) and Schedule Performance Index (SPI) are displayed on the project dashboard. Cumulative S-Curves are generated automatically and can be shared with project owners and financing banks.
Site Hindrance and EOT Log
Every obstacle affecting construction progress — delayed drawing submissions, right-of-way land acquisition, utility shifting delays, forest clearance hold-ups, adverse weather stoppages — is recorded with a start date, expected resolution date, and measured impact in calendar days. This timestamped log is the contractor's documented foundation for Extension of Time claims, protecting against liquidated damages.
Material Consumption Reconciliation
Theoretical cement, steel, bitumen, and aggregate consumption is calculated from the BOQ and compared against actual material issued from site stores — activity by activity. Wastage is identified at the WBS activity level, not hidden inside a general overhead account.
Plant, Machinery, and Fuel Tracking
Daily machine hours — working, idle, and breakdown — are logged against each piece of equipment. Diesel issued is tracked per machine per day. Fuel consumption is audited against working hours to detect pilferage. Preventive maintenance schedules are managed inside the same system.
Works Contract GST and TDS Compliance
Works Contract GST is handled at 18% (commercial) and 12% (government contracts). GSTR-1 and GSTR-3B are generated natively. TDS under 194C and 194J is automated. Form 26Q e-TDS export is available in one click.
Who Is This For?
This ERP is built for highway and expressway builders, bridge and tunnel contractors, metro and railway EPC companies, water pipeline contractors, and industrial infrastructure developers who need measurement-to-billing control, EVM project tracking, and Indian statutory compliance in one integrated platform.